There will be 24 hour electricity supply in Kashi on Diwali. There will be 24 hours electricity supply in Kashi on Diwali: Control room made in Chief and SE program, MD of the corporation will take report every 2 hours – Varanasi News
In Varanasi, CM has directed for uninterrupted power supply from Diwali till November 15, Dev Diwali. Purvanchal-Discom management has geared up regarding this. On the instructions of Shambhu Kumar, MD of Purvanchal Electricity Distribution, control in the zone and superintending engineer’s office.
,
Supply board repaired at sub-stations.
Supply arrangements will be made every 2-2 hours, report will be taken
Chief Engineer Arvind Kumar Singhal said that a control room has been made at the zonal and SE office. Four staff have been deployed here. Reports on the supply system are being taken every two hours. Executive engineers have also prepared at their own level. So that, as soon as information about the fault is received, the lineman and JE can be dispatched to the spot.
Control rooms have been prepared at sub-centres.
Shut-down banned in Varanasi
The Chief Engineer said that monitoring is being done from the circle office level. Officials have been instructed to inspect populated areas. The Chief Engineer said that the shutdown has been banned. If necessary, you will have to take permission from your superiors. Meanwhile, the Chief Engineer inspected Godaulia and Bhadaini sub-centres on Tuesday. During this he checked the duty register.
Discover more from Divya Bharat 🇮🇳
Subscribe to get the latest posts sent to your email.