Electric vehicle charging points to be made mandatory in all large buildings: Deputy CM


All large buildings, including apartment complexes, have to mandatorily have charging points for electric vehicles, and suitable norms to ensure the same were being drafted, said Deputy Chief Minister C.N. Ashwath Narayan on Monday.

He was addressing a panel discussing sustainable mobility at the ongoing Harvard India Conference on Monday. Sources in the Urban Development Department said a proposal to make it part of building by-laws was being considered.

Suresh Hari, chairman, CREDAI-Bengaluru welcomed the move and said many builders had already been providing charging infrastructure in large residential projects, and making it a norm would compel everyone to follow suit.

However, urban infrastructure expert Ashwin Mahesh said the renewable energy sector was driving down energy prices rapidly, even as the density of energy-saving devices and the speed with which it can be charged is increasing, creating a market dynamic of its own. โ€œGiven how minimal the needs of charging infrastructure are, the market has already begun providing it. The government only needs to create an enabling policy, but must also worry about alternate revenue sources since tax on fossil fuels constitutes a major share of the governmentโ€™s revenue. Days of having battery-run houses are not far either,โ€ he said.

Dr. Ashwath Narayan said battery run vehicles were likely to hit the roads very soon and battery banks, where vehicle owners can rent batteries and recharge them will be available in the near future. He said Karnataka was the first State to introduce an electric vehicle policy. โ€œKarnataka is a power surplus State now, and we are giving power to vehicles at subsidised prices,โ€ he said.

KIA old runway

Meanwhile, work on reconstruction of the old runway at Kempegowda International Airport (KIA) will be completed by the end of February, said Dr. Ashwath Narayan, after inspecting the work at KIA.

โ€œAt present, flights have been making use of the new runway. The reconstructed old runway will be available for public use by the end of March,โ€ he said.

You have reached your limit for free articles this month.

Subscription Benefits Include

Today’s Paper

Find mobile-friendly version of articles from the day’s newspaper in one easy-to-read list.

Unlimited Access

Enjoy reading as many articles as you wish without any limitations.

Personalised recommendations

A select list of articles that match your interests and tastes.

Faster pages

Move smoothly between articles as our pages load instantly.

Dashboard

A one-stop-shop for seeing the latest updates, and managing your preferences.

Briefing

We brief you on the latest and most important developments, three times a day.

Support Quality Journalism.

*Our Digital Subscription plans do not currently include the e-paper, crossword and print.



Source link

Leave a Reply

Your email address will not be published. Required fields are marked *